*LU-1 ST LOUIS, MO*
LOCAL IS HOLDING STEADY. CALLS FOR NGA HAS SLOWED DOWN, BUT THERE IS STILL A SUBSTANTIAL AMOUNT OF WORK TO BE DONE ON THE PROJECT. IT IS UNDER THE NATIONAL CONSTRUCTION AGREEMENT WORKING 6-8'S PAYING $43.56 & HAS PERSONAL SICK DAYS FOR EVERY 30 HRS WORKED. THIS IS A GOVERNMENT FACILITY THAT REQUIRES A BACKGROUND CHECK. THE BJC QUEENY TOWER EXPANSION IS STILL A WAS OUT FROM HIRING WIREMEN & THE CONVENTION CENTER REMODEL/EXPANSION IS ALSO IN THE EARLY PHASE 1 STAGE WITH A HANDFUL OF WIREMEN ONSITE. THE BIG MEAT PROCESSING PLANT IS IN SITE PREPARATION PHASE &THE GM SHUTDOWN IS SCHEDULED TO START DECEMBER 17TH. IT IS SCHEDULED TO RUN FOR 5 WEEKS & IT IS SUPPOSABLY THE LAST BIG SCHEDULED SHUTDOWN FOR THE EXPANSION THAT WERE PREVIOUSLY DONE. SACHS HAS PUT IN CALLS FOR PRE-OUTAGE WORK BEFORE THE SHUTDOWN & IS EXPECTED TO HIRE MORE BEFORE IT BEGINS.PAYNECREST NOT LIKELY TO PUT CALLS IN UNTIL RIGHT BEFORE THE SHUTDOWN. CALL HALL FOR DETAILS.
*LU-13 BURLINGTON, IA*
WORK IS STILL GOOD IN THE AREA. NO REALLY LARGE PROJECTS, BUT CALLS HAVE BEEN STEADY. THERE IS A 150 MW SOLAR PROJECT SCHEDULED TO START IN LATE SPRING & CARGILL IN EDDYVILLE HAS ANOTHER PHASE OF THE SURFER PROJECT COMING OUT FOR BID NEXT YEAR THAT WILL REQUIRE A LARGE AMOUNT OF MANPOWER. ALOS TALKS OF SOME OTHER VERY LARGE JOBS COMING LATER IN 2023 AT IOWA ARMY AMMUNITIONS PLANT IN MIDDLETOWN THAT IS EXPECTED TO LAST INTO 2026, AS WELL AS A MAINTENANCE SHUTDOWN NEXT SUMMER AT THE IOWA FERTILIZER PLANT IN WEVER.CALL HALL FOR DETAILS.
*LU-16 EVANSVILLE, IN*
THE TOYOTA PLANT IN PRINCETON HAS AN OUTAGE SCHEDULED FOR DECEMBER 23RD TO DECEMBER 30TH (NOT WORKING CHRISTMAS DAY). EXPECT TO BE SEEING SHORT CALLS COMING IN SOON FOR THIS OUTAGE. BMWC HAS BEEN AWARDED PROJECT AT THE ALCOA/KAISER FACILITY IN NEWBURGH. THE PROJECT HAS STARTED & CONTRACTOR WILL BE PLACING MANPOWER CALLS AS NEEDED. STATE GROUP MAY HIRE A FEW MORE FOR 6-7 MONTH PROJECT AT THE GM PLANT IN BEDFORD THAT MIGHT START AS EARLY AS THIS MONTH. THE GM PLANT HAS AN EXPANSION PLANNED FOR THE NEAR FUTURE. LOCAL HAS QUITE A BIT OF WORK ON THE HORIZON, BUT SEVERAL SOLAR FARMS THAT WERE ANTICIAPTED TO START SOON HAVE BEEN DELAYED, POSSIBLE A YEAR, DUE TO SUPPLY & PANEL SHORTAGES. THERE ARE STILL SEVERAL UPCOMING SOLAR PROJECTS IN THE JURISDICTION, ONE IN PIKE COUNTY AND ONE IN WARRICK COUNTY, TWO IN GIBSON COUNTY & TWO IN POSEY COUNTY. THE COAL TO DIESEL PLANT IN DALE IS STILL A GO, BUT UNCERTAIN OF A START DATE AT THIS TIME. THE TOYOTA PLANT IN PRINETON HAS SLATED $800 MILLION DOLLARS TO ADD TWO NEW SUV LINES TO THEIR CURRENT LINE UP. WHILE NO START DATE ON PROJECT, WORKS ALREADY LOOKS TO BE UNDERWAY, PRIMARY ON WEEKENDS. ADDITIONAL WORK INCUDES THE CRANE NAVEL BASE IN CRANE, FERTILIZER PLANT & OTHER LOCAL PROJECTS. CALL HALL FOR DETAILS.
*LU-20 DALLAS/FT WORTH, TX*
LOCAL HAS BEEN VERY STEADY THE LAST FEW MONTHS WITH CALLS GOING UNFILLED DAILY.THERE ARE CE/CW CALLS AS WELL. WORK PICTURE IS STILL STEADY, BUT A LITTLE SLOWER. ALTERMAN HAS WORK AT THE WYLIE TREATMENT PLANT, PDK INVESTMANT HAS WORK AT THE CRESCENT IN DALLAS & CONTI HAS SHORT TERM WORK AT GM.CONTI HAS A CHRISTMAS SHUTDOWN COMING UP AT GM THAT IS EXPECTED TO CALL FOR 100 WIREMEN & PAYING $10 OVER SCALE. CALLS SHOULD START COMING IN DEC 15TH WITH THE SHUTDOWN SCHEDULED TO START DEC 24TH & LAST ABOUT A WEEK.MORE CALLS FOR FREEMAN ANTICIPATED FOR THE 2ND WEEK OF JAN ATTHE WYLIE WATER TREATMENT PLANT. CALL HALL FOR DETAILS. STATE LICENSE REQ ON MOST PROJECTS.
*LU-22 OMAHA, NE*
LOCAL NEEDS HELP!!!AREA HAS BEEN STRUGGLING TO FILL CALLS AT BOTH DATA CENTERS, FACEBOOK IN SPRINGFIELD, NE & GOOGLE IN PAPILLION, NE. PAYNECREST CALLS FOR FACEBOOK ARE IS WORKING 5-9'S & AN 8 WITH MILLER CALLS FOR GOOGLE WORKING 5-10'S & AN 8 ON SATURDAY WITH GOOGLE ALSO REQUIRING A BACKGROUND CHECK. BOTH PROJECTS HAVE VOICED THEIR CONCERNS ON MANPOWER FOR THEH FUTURE EXPANSION OF BUILDINGS ON THEIR SITES. THEY ALSO HAVE A $139 MILLION DOLLAR HIGH SCHOOL IN GRETNA, NE, HAVE BEEN AWARDED THE NEW SARPY COUNTY GOOGLE PROJECT THAT IS LOCATED NEAR DATA CENTER AND ALSO AWARDED WORK ON A NEW $53 MILLION DOLLAR WATER PARK IN GRETNA, NE. THAT ALONG WITH THE WORK AT THE DATA CENTERS SHOULD GENERATE A LOT OF WORK FOR LOCAL MEMBERS AS WELL AS TRAVELING BROTHERS & SISTERS. THE AMAZON PROJECT WITH ECA WILL BE COMING TO AN END SOON.WHEN THE CALLS ARE LISTED AS "JW ELECTRICAL LICENSE" IT MUST BE A CLASS A LICENSE. IF THE CALLS ARE LISTED AS SIMPLY "ELECTRICAL LICENSE", AN UNCLASSIFIED IOWA LICENSE & NEBRASKA APPRENTICE LICENSE ARE ACCEPTABLE. NEBRASKA APPRENTICE LICENSE ARE AVAILABLE AT THE HALL FOR $23 GOOD FOR 1 YEARS SO LONG AS YOU HAVE NEVER HAD ONE PREVIOUSLY.CALLS ON THE COUNCIL BLUFF SIDE MUST HAVE IOWA STATE LICENSE OR UNCLASSIFIED LICENSE, STEEL TOED BOOTS, OSHA-10 WITHIN THE LAST 5 YEARS IN HAND & CURRENT DUES RECIEPT TO PICK UP REFERRAL. ALL OTHER LOCAL CALLS REQUIRE A NEBRASKA STATE LICENSE BUT AN APPRENTICE LICENSE IS AVAILABLE AT THE HALL.
*LU-34 PEORIA, IL*
WORK CONTINUES TO BE BUSY THROUGHOUT THE JURISDICTION. THE CANCER CENTER IN DOWN TOWN PEORIA IS ENCLOSED & WILL BE A NICE WARM JOB FOR THE WINTER MONTHS. COMMUNITY SOLAR FARMS (2MW) THAT WERE SCHEDULED TO START IN THE FALL, BUT HAVE BEEN PUSHED BACK TO NEXT YEAR. THERE ARE MULTIPLE SOLAR & WIND FARMS THAT ARE STILL PLANNED FOR THE COMING YEAR AND INTO 2024. BUILDING SHELL & PARKING LOT IS MOVING AHEAD & WITH THE PROTON VAULT AND THE BUILDING IS ONGOING. THERE ARE ALSO PLANS TO BUILD A 100 BED MENTAL HEALTH FACILTY IN PEORIA AS WELL AS A NEW CONTROL TOWER AT THE PEORIA INTERNATIONAL AIRPORT. THE AMAZON FULFILLMENT CENTER IN PEKIN IS WINDING DOWN & WILL FREE UP SOME LOCAL MANPOWER SOON AND MOST MEMBERS WORKING AT CATERPILLAR FACILITIES & THE CANCER CENTER ARE WORKING PLENTY OF OVERTIME. THE VA CLINIC IN QUINCY IS RAMPING UP & WILL NEED HELP FROM BOOK 2 TO GET IT COMPLETED ON TIME. UNFILLED CALLS IN AREA RANGE FROM 40/HR SERVICE WORK TO 60+ HR INDUSTRIAL WORK. CALL HALL FOR DETAILS.
*LU-38 CLEVELAND, OH*
WORK OUTLOOK REMAINS VERY STRONG.LOCAL PUTTING TRAVELERS OUT CONSISTENTLY FOR LAKE ERIE ELECTRIC AT CLEVELAND CLIFFS STEEL MILL. SHERWIN WILLIAMS RESEARCH & DEVELOPMENT CREW SIZE SHOULD INCREASE BY 100 WIREMEN OVER THE NEXT 6 MONTHS. SHERMIN WILLIAMS 35 STORY HQ HAS STARTED AS WELL. CLEVELAND CLINIC HAS OVER $1 BILLION SLATED FOR CONSTRUCTION & HAVE REDUCED BADGING REQUIREMENTS FOR NEW CONSTRUCTION. METRO HOSPITAL & UNIVERSITY HOSPITAL HAS OVER 2 MILLION SQ FT OF NEW CONSTRUCTION STARTED & WILL CONTINUE OVER THE NEXT FEW YEARS. CLEVELAND CLINIC REQUIRES BADGING, ICRA, & MUST BE VACCINATED TO WORK ON ANY CCF PROPERTIES. OTHER PROJECTS SLATED FOR 2023 INCLUDE CHARTER STEEL, GUARDIANS STADIUM, CENTENNIAL BUILDING, UNIVERSITY HOSPITA & SEVERAL RESIDENTIAL/MIXED USE DEVELOPMENTS THROUGHOUT THE JURUSDICTION.MUST SIGN IN PERSON WITH A YEARLY RESIGN IN FEBRUARY. CALL HALL FOR DETAILS.
*LU-153 SOUTH BEND, IN*
LOCAL 153 IS STEADY!THERE ARE NUMEROUS OPEN CALLS FOR TELECOMMUNICATIONS. LOCAL CONTRACTORS CALLS ARE TRICKLING IN, LOOKING TO RAMP UP AFTER THE HOLIDAYS. HONEYSUCKLE SOLAR PROJECT SHOULD START HIRING IN A FEW WEEKS (WEATHER PENDING). AWAITING ANNOUNCMENT OF BATTERY PLANT, ANTICIPATING SPRING START. MEMORIAL HOSPITAL IS STALLED DUE TO MECHANICAL MATERIAL COMPLICATIONS, HOPEFULLY SPRING START. HALL SHOULD HAVE MORE INFORMATION FOLLOWING THE HOLIDAYS.
*LU-234 CASTROVILLE, CA*
WORK IS GOOD IN THE AREA. THERE ARE 2 JOBS ONGOING AT POWER PLANT AT MOSS LANDING FOR THE 350 MW BATTERY BACKUP PROJECT. CA STATE CERTIFIED PREFERRED, BUT MAY TAKE A TRAINEE CARD IF EXPERIENCED IN BATTERY. LOOKING TO TOP OUT AT ABOUT 120 WIREMEN. CALL HALL FOR DETAILS.MOST CALLSREQUIRE A STATE LICENSE OR A STATE CERT (CA) OR TRAINEE CARD. DRUG TEST WILL BE ONSITE.MOST OTHER CALLS MUST HAVE A CALIFORINA STATE CERTIFICATION & WILL BE DRUG TESTED. NEED A CURRENT DUES RECEIPT & TRAVEL LETTER TO SIGN BOOK & THERE IS A 3 STRIKE RULE IN EFFECT. CAN GET ON THE BOOKS BY GOING TO:ibewlocal234.org
*LU-265 LINCOLN, NE*
LOCAL HAS BEEN A WALK THROUGH FOR OVER A MONTH.A MIX OF IN TOWN COMMERCIAL PROJECTS AND CALLS FOR INDUSTRIAL WORK WITH COMMONWEALTH WITH OVERTIME AVAILABLE. COMMERCIAL WORK INCLUDES NEW HIGH SCHOOLS, WORK AT A NEW PHARMACEUTICAL PLANT, AND A CASINO THAT JUST BROKE GROUND. SEVERAL CALLS ARE PAYING AN ADVANCED WAGE AND A COUPLE CALLS HAVE INCENTIVE PAY. MOST PROJECTS WORKING 40/HR WEEKS AT THIS TIME. WE LOOK TO BE BUSY THROUGH 2023 WITH A LOT OF POTENTIAL JOBS INCLUDING A NEW CARBON PLANT, A POTENTIAL DATA CENTER & A LOT OF IN-TOWN COMMERICAL PROJECTS.CHECK THE WEBSITE OR CALL HALL FOR DETAILS.
*LU-302 MARTINEZ, CA*
WORK HAS PICKED UP IN THE AREA. THE FIRST 2 REWABLE PROJECTS HAVE STARTED WITH BOTH WORKING 6-10'S AT THIS TIME. WORK IS AT THE MARATHON REFINERY & THERE HAVE BEEN DAILY UNFILLED CALLS FOR IT.THERE IS A SHUTDOWN UPCOMING AT CHEVRON REFINERY. EXPECTED TO BE LOOKING TO HIRE 100 ELECTRICAINS BY SEPTEMBER. OTHER RENEWABLE PROJECT IS AT PHILLIPS 66. THAT PROJECT LOOKING TO MAN UP LATE AUGUST GOING INTO THE FALL MONTHS & LOOKING TO HIRE 150-200 WIREMEN AT PEAK. BOTH PHILLIPS 66 & MARATHON REFINERIES ARE BEING CONVERTED TO RENEWABLE DIESEL PLANTS. THESE PROJECTS ARE PROJECTED TO BE 4 MILLION MAN HOURS & HAVE A 18 TO 24 MONTH DURATION.INDUSTRIAL CALLS REQUIRE STATE LICENSE FROMANY STATE. CA STATE LICENSE REQUIRED ON MOST OTHER CALLS. CALL HALL FOR DETAILS.
*LU-347 DES MOINES, IA*
LOCAL IS BUSY & HAS MULTIPLE UNFILLED CALLS FOR SOME TIME NOW!FACEBOOK HAS 2 BUILDINGS IN ALTOONA & MICROSOFT CURRENTLY ALSO HAS 3 PROJECTS UNDERWAY WITH MOST ALL THESE ARE WORKING OVERTIME. HOSPITAL JOB IS UNDERWAY & APPLE IS SLOWLY TRYING TO GET STARTED, MOST LIKELY NOT UNTIL FALL. LOCAL STILL HAS A COUPLE HUNDRED TRAVELING BROTHERS & SISTERS WORKING IN THE AREA. EXPECTING WORK TO BE IS EXPECTED TO BE BUSY ALL SUMMER. AN IOWA UNCLASSIFIED LICENSE IS GOOD FOR MOST CALLS & IS AVAILABLE FOR $20 FOR THE YEAR, WHICH IS ALSO PRO-RATED DEPENDING ON WHEN YOU AQUIRE IT. CALL HALL FOR DETAILS.
*LU-357 LAS VEGAS, NV*
UNFILLED CALLS WEEEKLY.CALLS GOING TO LAS VEGAS STRIP PROJECTS UNFILLED. LOCAL'S TWO UTILITY SCALE SOLAR PROJECTS (GEMINI & YELLOW PINE) ARE GOING TO BOOK 2 SOON. FONTAINEBLEAU AND MSG SPHERE WILL NOT OPEN UNTIL SUMMER/FALL OF 2023. LOW VOLTAGE CALLS GOING DEEP INTO BOOK 2. ALL SOLAR CALLS REQUIRING A PV (PHOTOVOLTAIC) CERTIFICATION. THIS IS A TEST REQUIRED CERTIFICATION THAT COST $25 AND WILL BE ADMINISTERED BY NEVADA OSHA. YOU CAN GO TO THEIR WEBSITE OR LOCAL'S WEBSITE TO FIND AVAILABLITY FOR TESTING TO ACQUIRE THIS CERT. TESTING NEEDS TO BE SCHEDULED 4 TO 6 WEEKS PRIOR TO TAKING A CALL IN VEGAS. CALL HALL FOR DETAILS.
*LU-429 NASHVILLE, TN*
WORK IS STEADY IN THE AREA,. THERE ARE A COUPLE OF UPCOMING OUTAGES IN THE FALL. THE FIRST IS AT TVA GALLATIN THAT WILL BE STARTING THE 1ST OF SEPTEMBER & EXPECTED TO LAST 75 DAYS WORKING OVERTIME. THE NEXT WILL BE AT CUMBERLAND CITY & WILL START AT THE END OF SEPTEMBER & EXPECTED TO LAST ABOUT 75 DAYS WORKING OVERTIME AS WELL. TVA IS STARTING TO MAN UP & THERE IS ALSO WORK AT NEW JOHNSONVILLE WHICH WILL START HIRING IN OCT. THERE IS SOME UPCOMING WORK IN TULLAHOMA AT THE BASE WITH ALL THESE PROJECTS REQUIRING A BACKGROUND CHECK. ROSENDIN STILL PUTTING CALLS IN FOR WOOLHAWK DATA CENTER WORKING 6-10'S. GM SPRINGHILL JOB IS ONGOING & STILL MANNING UP. CONTRACTORS ARE PICKING UP WORK. PROJECT WORKING 5-10'S & EXPECTED TO LAST ANOTHER 2 YEARS WITH NEW PAINT SHOP, NEW BATTERY PLANT AND ONGOING WORK INSIDE THE PLANT. THE MPEC CENTER IN CLARKSVILLE WORKING 4-10'S W/POSSIBLE OVERTIME. MEMBERS CAN GET ON BOOKS BY FAX FROM HOME LOCAL WITH CURRENT TRAVEL LETTER, A COPY OF PAID UP DUES RECIEPT, A GOOD WORKING PHONE NUMBER AND SS#. MEMBERS CURRENTLY ON THE OUT OF WORK LIST CAN CHECK THEIR POSITION VIA THE WEBSITE:ibew429.org THERE IS ALSO ACCESS TO CHECK THE JOB BOARD, BID ON CALLS AS WELL AS MONTHLY RESIGN.WEBSITE UPDATES EVERYDAY AROUND 5PM FOR NEW & LEFTOVER CALLS.
*LU-440 RIVERSIDE, CA*
LOCAL IS BEEN GOING DEEP INTO BOOK 2. SEVERAL SOLAR PROJECTS & BATTERY STORAGE PROJECTS WITH $15/HR SUBSISTENCE PAY ON TOP OF $49.73 WAGE. THERE IS ANOTHER 500 MW PLUS A 250 MW BATTERY STORAGE STARTING SOON & CONTRACTORS ARE ALREADY MOVING DIRT & FENCING.CONTRACTORS DOING THE LARGE SCALE SOLAR PROJECTS IN THE DESERT HAVE WAIVED THE STATE CERTIFICATION REQUIREMENTS.THERE IS LOCAL WORK MANNING UP NOW THAT IS ALSO GETTING INTO BOOK 2. ALL OTHER CALLS REQUIRE A CALIFORNIA STATE LICENSE. ZONE B CALLS RECEIVE AN ADDITIONAL $15/HOUR PER DIEM. CALL HALL FOR DETAILS.
*LU-477 SAN BERNARDINO, CA*
LOCAL IS AT FULL EMPLOYMENT & WILL BE NEEDING HELP. MOST CALLS ARE NOW GOING THROUGH BOOK 2 & SOME DAYS AS FAR AS BOOK 4. THERE ARE 2 SOLAR PROJECTS THAT HAVE WAIVED THE STATE LICENSE. ONE OF THEM IS IN ZONE A ($48.20/HR) AND ONE IS IN ZONE B ($63.80) WITH A DURATION OF ABOUT 10 MONTHS ON THESE PROJECTS.DAGGETT SOLAR PROJECT IS ABOUT PEAKED MANPOWER AT 350 WIRMEN WITH ABOUT 2 YEARS LEFT ON THIS 650 MW. STILL A LOT OF WORK IN CHINA LAKE NAVY WEAPONS FACILITY ALSO. THESE SITES DO REQUIRE A STATE CERTIFICATION CURRENTLY, BUT MAY BE WAVED IN THE FUTURE. HOUSING IS PAID FOR BY THE BASE WITH A BACKGROUND CHECK REQUIRED THAT TAKES ABOUT 3 WEEKS TO COMPLETE WITH A 2-3 YEAR DURATION LEFT ON THE PROJECT. THERE ARE ALSO 3-4 MORE SMALLER 150-200MW UTILITY SCALE SOLAR PROJECTS JUST BREAKING GROUND NOW. ALL 3 OF THESE ARE IN ZONE A WITH EACH REQUIRING 100-150 WIREMEN WITH A YEAR DURATION AFTER THEY START. OTHER LOCAL WORK ONGOING AS WELL INCLUDING COMMUNITY COLLEGE JOB STARTING UNDERGROUND ($13 MILLION DOLLAR ELECTRICAL WITH A 2-3 YEAR DURATION) AND STATE COLLEGE ($16 MILLION DOLLAR ELECTRICAL). MOST CALLS REQUIRE A CA STATE LICENSE. CALL HALL FOR DETAILS.
*LU-481 INDIANAPOLIS, IN*
WORK IS GETTING BUSY. MOST CALLS ARE 40 HR/WEEK CALLS. HIRING SHOULD START IN NOVEMBER FOR PROJECT SANTA IN FISHERS (UPDATE SOON ON SCHEDULE AND HOURS) WORK WILL CONTINUE AT THE CRIMINAL JUSTICE CAMPUS AND FEDEX AT THE AIRPORT, PAN AM PLAZA HOTEL DOWNTOWN AND THE BIG 1.6 BILLION DOLLAR IU METHODIST HOSPITAL TOWER. ADDITIONALLY, 325 MILLION EXPANSION OF ST. VINCENT HOSPITAL WORK SHOULD START IN OCTOBER/NOVEMBER ON NEW PET FOOD PLANT IN RUSHVILLE IN CALL JOBLINE FOR MORE DETAILS-(317)923-2596AFTER 4:30 PM. LOCAL 481 REFERRAL IS BEING HANDLED ELECTRONICALLY AT THIS TIME. SIGN BOOK 2 WITH A FAX FROM YOUR HOME LOCAL LETTERHEAD. THE MEMBER’S BASIC PAGE WITH LPE WITH ALL INFORMATION THAT THE MEMBER IS NOT WORKING & IN GOOD STANDING.LOCAL481 HAS IN PERSON RESIGN
*LU-490 CONCORD, NH*
WORK IS STARTING TO PICK UP AGAIN. LOCAL HAS HAD SOME OPEN CALLS FOR PHARMACEUTICALS PROJECT THAT IS A GOOD INSIDE JOB THAT IS EXPECTED TO LAST THRU THE WINTER. OTHER PROJECTS CONSIST OF SOME SOLAR, BUT MOST OF IT IS TRADITIONAL ELECTRICAL WORK.CALL HALL FOR DETAILS.
*LU-531 LA PORTE, IN*
LOCAL HAS UNFILLED CALLS & NEEDS HELP!!!MJ ELECTRIC WORKING AT CLEVALAND CLIFFS-BURNS HARBOR & POSSIBEL OTHER INDUSTRIAL SITES. THESE ARE LONG CALLS, 3-6 MONTHS WORKING SPOTTY OVERTIME. THERE ARE ALSO CALLS FOR AUSTGEN ELECTRIC WORKING 40/HR WEEKS AT I-65 WELCOME CENTER FOR AT LEAST 2 MONTH DURATION, BUT POSSIBLY LONGER. WILL BE NEEDING MORE WIREMEN FOR LARGE 700 MW SOLAR FARM IN WHEATFIELD WITH CALLS COMING IN ALMOST WEEKLY. NICTD DOUBLE TRACK PASSENGER RAIL EXPANSIONPROJECT NEEDS HANDS FOR 2-4 MONTH DURATION WORKING 5-10'S & WILL BE LOOKING TO HIRE 15-20 WIREMEN. THIS RAIL EXPANSION IS FOR THE SOUTH SHORE LINE FROM SOUTH BEND TO CHICAGO. THE BULK OF THIS WORK WILL BE OUT OF LU 697 JURISDICTION & SHOULD LAST 3 YEARS WITH TRAIN STATIONS, PARKING GARAGES, ETC. PROJECT IS ALSO ALLOTING 300 ACRES PER TRAIN STATION FOR BUSINESS DEVELOPMENT WHICH SHOULD BE POTENTIAL FOR MORE WORK. LOCAL ALSO HAS 2 YEARS WORTH OF SCHOOL WORK THAT IS SCHEDULED TO START LATE APRIL/MAY. THIS IS A$180 MILLION DOLLAR PROJECT TO BUILD 3-4 NEW SCHOOLS IN CHESTERTON AND HEAVY REMODEL OF THE ONES NOT BEING TORN DOWN. $400 MILLION DOLLAR PRISON JOB NOT EXPECTED TO START UP UNTIL LATE THIS YEAR OR THE BEGINNING OF 2023. CALL HALL FOR ANY DETAILS.
*LU-558 SHEFFIELD, AL*
META/FACEBOOK PROJECT IS STARTING TO INCREASE IN MANPOWER WITH CALLS COMING IN STEADILY. JOB IS LOCATED IN MADISON, AL & IS CURRENTLY WORKING 4-10'S & 2 8'S. NEWTRON IS ON THE TVA COLBERT SIMPLE CYCLE PROJECT IN TUSCUMBIA, AL. THIS IS A GAS TURBINE COMING OUT OF THE GROUND. PROJECT STARTED ABOUT 2 MONTHS AGO & HAS A 10 MONTH DURATION. JOB IS CURRENTLY WORKING 5-10'S W/OPTIONAL SATURDAYS. THERE ARE CURRENTLY 20 WIREMEN ONSITE & EXPECTED TO INCREASE TO 100 WIREMEN BY THE END OF OCTOBER. BELTLINE ELECTRIC & PETROTECH ALSO HAVE JOBS AT TVA COLBERT, CT. CALLS ARE COMING IN REGULARLY WITH PROJECT WORKING 6-10'S. STILL A FEW CALLS TRICKLING FOR TOYOTA/MAZDA, MOST WORKING 40 HRS. THERE ARE ALSO A FEW CALLS STILL FOR REFUELING OUTAGE AT BROWNS FERRY NUCLEAR PLANT FRO DAY & ZIMMERMAN WORKING 6-12'S. THE OUTAGE IS JUST STARTING & ANTICIPATED TO CUT BACK AT THE END OF OCTOBER. OTHER LOCALS CALLS GOING INTO BOOK 2 AS WELL AS OTHER TVA WORK AVAILABLE. CALL HALL FOR DETAILS.
*LU-570 TUCSON, AZ*
OPEN JOB CALLS WORKING AT LOCAL AREA MINES, MUST HAVE MSHA. JOBS AT RAYTHEON, MUST HAVE ORIGINAL BIRTH CERTIFICATE. WORKING 5-10S. NO STATE LICENSE REQUIRED.
*LU-573 WARREN, OH*
LOCAL HAS BEEN STAYING BUSY WITH THE ULTIUM CELLS BATTERY PLANT. THERE ARE MULTIPLE CONTRACTORS ONSITE INCLUDING LAKE ERIE ELECTRIC, CONTI, VEC, DICKEY ELECTRIC, GEM, HUNT/LIGHTHOUSE, T SQUARED& ELECTRICAL INSIGHTS. SOME OF THESE PROJECT'S AT ULTIUM CELLS WILL BE ANOTHER 12+ MONTHS. THERE IS A 1.2 BILLION DOLLAR COMBINED CYCLE NATURAL GAS POWER PLANT LOCATED IN LORDSTOWN, OH STARTING IN THE SPRING OF 2023. THERE IS A 240 BED CAMPUS STYLE HOSPITAL PROJECT THAT IS ANTICIPATED TO START SOMETIME IN 2023 AS WELL. WORK OUTLOOK WITH ALL UPCOMING PROJECTS, ALONG WITH OTHER RUMORED ONES, LOOKS TO KEEP THE AREA BUSY FOR A WHILE. THERE ARE A LOT OF HOTELS WITHING 20 MINUTES OF THE BULK OF THE WORK IN THE JURISDICTION. CALL THE HALL FOR DETAILS.
*LU-611 ALBUQUERQUE, NM*
FACBOOK IS STILL ONGOING & HAS YEARS LEFT ON IT. EARLIER THIS YEAR, THEY BROKE GROUND ON 2 NEW BUILDINGS KEEPING 350-450 WIREMEN BUSY. WITH ALL THE WORK, THEY EXPECTED TO BE STRETCHED THIN & WILL NEED A LOT OF HELP FROM OUR TRAVELING BROTHERS & SISTERS. INTEL HAS BEEN A LITTLE SLOW AS OF LATE. DEMO FINISHED A FEW MONTHS BACK & TOO INSTALL HAS STARTED & THEY ARE ANTICIAPTING MORE CALLS IN THE NEAR FUTURE.PAYING $140/DAY INCENTIVE FOR TRAVELERS WITH A VERIFIED ADDRESS 75 MILES OR FURTHER FROM PLANT LOCATION ALONG WITH $4 AND HOURINCENTIVE & $25/DAY PER DIEM. JOB IS WORKING 5-10'S & SATURDAYS.LOS ALAMOS NATIONAL LABORATORY IS STILL GOING STRONG. THEY ARE ALSO PAYING $10 OVER SCALE WITH THEIR OWN CONTRACT & SCALE IS HIGHER THAN THE INTOWN $35.20 SCALE. THE MAINTENANCE SIDE IS $41.21 & CONSTRUCTION SIDE IS $41.40. COMPANY DOES HAVE THE RIGHT TO MOVE YOU FROM MAINTENANCE TO CONSTRUCTION AT WILL. THIS IS A LONG TERM JOB AS THEY PUT YOU IN FOR A SECURITY CLEARANCE (Q CLEARANCE) THAT IS PUT ON BY THE FBI & CAN TAKE A YEAR TO OBTAIN-YOU WILL BE ESCORTED UNTIL CLEARANCE IS CLEARED. THERE ARE SEVERAL AMENITIES IN THEIR CONTRACT, INCLUDING 20 HOURS/MONTH PTO, PAID HOLIDAYS, $200/YEAR FOR BOOTS, ETC. THERE ARE A LOT OF OTHER 40 HR WORK AROUND THE AREA AS WELL. NEED A NEW MEXICO STATE LICENSE (EE-98J) ORLOCAL DOES RECIPROCATE WITH THE FOLLOWING STATES: ALASKA, ARKANSAS, COLORADO, IDAHO, MONTANA, NEBRASKA, OKLAHOMA, SOUTH DAKOTA, UTAH, TEXAS & WYOMING. SIGNED IN PERSON. CONTACT THE HALL FOR ANY QUESTIONS OR FURTHER INFO.
*LU-640 PHOENIX, AZ*
LOCAL IS BUSY & NEEDS HELP!ROSENDIN ELECTRIC AT INTEL DATA CENTER IN CHANDLER, AZ IS NOW PAYING $5.00 OVER SCALE. CONTRACTORS ONSITE INCLUDE ROSENDIN, OREGON ELECTRIC, B&D AND SPECTRA. STURGEON ELECTRIC HAS A DATA CENTER WORKING 60/HR WEEKS & SOME SUNDAYS. TILDEN DATA CENTER IN EAST MESA NOW PAYING $7.00 OVER SCALE & WORKING 60/60/50 HR/WEEK SCHEDULE. MAZ DATA CENTER PAYING $8.00 OVER SCALE & WORKING 60 HR/WEEK SCHEDULE. LUCID MOTORS CASA GRANDE IS PAYING $75/DAY & WORKING 50/WEEKS WITH SOME SATURDAYS. THE KOLHER-VIKRELL PLANT JOB IN CASA GRANDE, AZ IS PAYING $75/DAY & WORKING 50 HR/WEEK SCHEDULE. THE PROJECT IS WORKING FIRST & SECOND SHIFTS. THE TSMC CHIP PLANT IS PAYING $5.00 OVERSCALE & WORKING 60/60/50 HR/WEEK SCHEDULE. CMC STEEL JOB IN APACHE JUNCTION, AZ IS WORKING 6-11'S & OPTIONAL SUNDAYS. THEY ARE ALSO PAYING AN ADDTIONAL $100/DAY. THE CHIP PLANTS ARE WORKING 60-60-50 SHIFTS. MOST OF THE DATA CENTERS ARE ALSO WORKING OVERTIME. MILKY WAY DAIRY IN MARICOPA PAYING $9.00 OVER SCALE. OTHER WORK INCLUDES BATTERY STORAGE FACILITIES, SOLAR PLANTS, HOSPITALS, OFFICE COMPLEXES & VARIOUS \COMMERICAL JOBS.NEED BROTHERS & SISTERS TO HELP MAN THIS WORK! CALL HALL FOR DETAILS.
*LU-649 ALTON, IL*
LOCAL HAS CALLS FOR P66 REFINERY STARTING ON MONDAY JUNE 27TH & TUESDAY JULY 5TH. THE CALL FOR JUNE 27TH IS 8 JW'S & THE CALLS FOR JULY 5TH IS FOR 8 JW'S. BOTH CALLS ARE FOR 6 MONTHS WITH POSSIBLE OVERTIME. WORK AT REFINERY IS ONGOING. MOST CALLS REQUIRES OSHA 10 & SECURE FIT EXAM WILL BE REQUIRED. CALL HALL FOR DETAILS.
*LU-659 MEDFORD, OR*
LOCAL IS STILL BUSY & HAS MULTIPLE OPEN CALLS IN THE AREA. PROJECTS INCLUDE NEW HOSPITAL TOWER BEING ADDED TO THE ASANTE HEALTH PAVILION IN MEDFORD FOR PEC ELECTRIC. JOB IS CURRENLY WORKING 4-10'S M-T WITH 8 HRS OVERTIME ON FRIDAY & PAYING $100/DAY INCENTIVE PAY. JOB IS EXPECTED TO LAST ANOTHER YEAR. PEC ALSO HAS CALLS FOR INSIDE THE HOSPITAL THAT REQUIRES PROOF OF VACCINATION. OTHER JOBS INCLUDE SERVICE & COMMERICAL WORK IN KLAMATH FALLS, WASTE WATER TREATMENTPLANT IN KLAMATH FALLS & MISC COMMERICAL. SWAN LAKE PUMPED STORAGE PROJECT IN KLAMATH FALLS HAS AN MOU TO BE UNION BUILT JUST COMING OUT OF THE GROUND. CALL HALL FOR DETAILS.OREGON LICENSED JOURNEYMEN WIREMEN REQUIRED OR THOSE ABLE TO RECIPROCATE, WHICH INCLUDE MONTANA, ARKANSAS, MAINE, WYOMING, UTAH, WASHINTON & IDAHO.
*LU-673 PAINESVILLE, OH*
WORK IN THE AREA IS GOOD, AND WILL CONTINUE TO STAY THAT WAY AS WE HEAD INTO 2023. LAKE ERIE ELECTRIC HAS APPROXIMATELY 25 ELECTRICIANS OVER AT THE CLEVELAND CLINIC HOSPITAL IN MENTOR. THEY HAVE BEEN WORKING 5-10s AND AN 8. THEY ALSO SECURED ANOTHER NEW HOSPITAL TO BE BUILT IN ASHTABULA, WHICH IS SIMILAR SIZE. THEY WILL START NEEDING MANPOWER ON THAT PROJECT WITHIN THE NEXT COUPLE OF MONTHS. WE ALSO HAVE OUR NUKE OUTAGE COMING UP IN PERRY IN MARCH OF 2023. IT’S APPROXIMATELY A 30 DAY OUTAGE THAT’S ESTIMATED TO TAKE AROUND 50 ELECTRICIANS, AND PROMISES TO PROVIDE LOTS OF OVERTIME. WE WILL DEFINITELY BE RELYING ON OUR BOOK 2 BROTHERS AND SISTERS TO HELP US MAN THAT OUTAGE. THE LATEST UPDATE ON THE PIG IRON PLANT SAYS THAT WE WILL START SEEING MOVEMENT BY THE SECOND QUARTER OF 2023.
*LU-683 COLUMBUS, OH*
LOCAL IS STILL VERY BUSY & EXPECTED TO REMAIN THAT WAY FOR THE NEXT SEVERAL YEARS.THE MUSTANG PROJECT IN NEW ALBANYWORKING 5-10'S & AN 8 ON SATURDAYS. CURRENTLY HAS ABOIT 400 WIREMEN ONSITE.OSU HOSPITAL, SOLAR FIELDS & OTHER LOCAL SMALLERCALLS FOR JIT'S (TELE/DATA) ALSO.LOCAL WILL NEED A LOT OF WIREMEN & LARGE CALLS GO TO THE BACK OF BOOK 2.CALL HALL FOR DETAILS.
*LU-700 FT SMITH, AR*
WORK IS VERY BUSY IN THE AREA & LOCAL HAVING A HARD TIME FILLING MANPOWER REQUESTS. SEVERAL UPCOMING PROJECTS OUT OF BID INCLUDING WALMART HOME OFFICE IN BENTONVILLE, FLINT CREEK POWER PLANT IN GENTRY, CASINO IN RUSSELLVILLE, AMAZON & NANTZE IN BENTONVILLE. CALL HALL FOR DETAILS.
*LU-714 MINOT, ND*
LOCAL IS STILL STEADY IN BOTH MINOT & WILLISTON AREA.INCLUDESCOMMERICAL WORK, INDUSTRIAL WORK & BIT COIN DATA CENTER IN THE WILLISTON, ND AREA.OILFIELD SERVICE WORK, INDUSTRIAL WORK IN & AROUND WILLISTON AREA AS WELL AS INDUSTRIAL WORK IN WATFORD CITY & NEW TOWN.MOST CALLS REQUIRE A STATE LICENSE. CALL HALL FOR DETAILS.
*LU-725 TERRE HAUTE, IN*
WORK IS GOOD IN THE AREA. THERE IS A 150 MW SOLAR PROJECT THAT HAS BROKEN GROUND ON THE CASINO & STEEL MILL PROJECTS. CATALENT FACILITY HAS A DECENT SIZED PROJECT THAT CONSISTS OF NEW PRODUCTION LINES FOR COVID VACCINE PACKAGING THAT IS PROJECT TO TO START AT THE FIRST OF THE YEAR. THE REFINERY IS ALSO EXPECTED TO MAN UP GOING INTO THE NEW YEAR, THERE IS MORE SOLAR WORK IN THE DOCKET & HERSHEY PLANT IN ROBINSON HAS A GOOD SIZED PROJECT AS WELL. CALL HALL FOR DETAILS.
*LU-816 PADUCAH, KY*
LOCAL IS STEADY AT THIS TIME WITH CALLS GOING INTO BOOK 2 WEEKLY. THERE IS A COMBUSTION CYCLE PROJECT GOING ON AT TVA PARADISE STEAM PLANT THAT IS WORKING 5-10'S. THERE ARE 2 CONTRACTORS ONSITE: MJ ELECTRIC & BELTLINE ELECTRIC WITH BOTH PAYING FULL INSIDE RATE AT $35/HR PLUS $100/DAY INCENTIVE PAY. PROJECT IS EXPECTED TO GO THROUGH THE SPRING OF 2023. LOTS OF OTHER WORK COMING AS WELL. THERE IS A BATTERY RECYCLING FACILITY THAT WILL RECYCLING MATERIALS FOR MAKING EV BATTERIES COMING TO HOPKINSVILLE, KY. LOOKING AT AN EARLY SPRING 2023 START & ANTICIPATING OVERTIME OUT OF THE GATE AS WELL AS NEEDING PLENTY OF WIREMEN FOR THIS PROJECT. LOOKING AT POSSIBLE WORK COMING AT CHEMICAL PLANTS IN CALVERT CITY, KY THIS SPRING THAT SHOULD ALSO NEED HELP FROM BOOK 2. CALL HALL FOR DETAILS.
*LU-873 KOKOMO, IN*
WORK HAS PICKED UP CONSIDERABLY OVER THE SUMMER AND WE EXPECT AN EXTREMELY BUSY 2-3 YEARS. STELLANTIS & SAMSUNG ARE PARTNERING UP WITH A $3 BILLION INVESTMENT TO BUILD A 3 MILLION SQ FT BATTERY PLANT IN KOKOMO. SCHEDULES ARE STILL BEING DISCUSSED, BUT WE EXPECT 2 SHIFTS OF 6-10S STARTING SPRING OF 2023 WITH APPROX 500 ELECTRICIANS NEEDED. GM IS INVESTING $480 MILLION IN THE STAMPING PLANT IN MARION. WE ALSO EXPECT THIS JOB TO WORK 2 SHIFTS OF 6-10S STARTING LATE FALL 2022/EARLY SPRING 2023 WITH APPROX 100 ELECTRICIANS NEEDED. THE STELLANTIS AND GM JOBS WILL BOTH BE NMA JOBS WITH 100% PAY SCALE AND PER DIEM BEING DISCUSSED. WE ALSO HAVE AN ONGOING 200 MW SOLAR FARM IN CLINTON COUNTY WHICH WILL NEED ADDITIONAL MAPOWER. THIS IS A VERY GOOD BOOK TO SIGN AS WE WILL NEED SEVERAL HUNDRED TRAVELING BROTHERS/SISTERS TO COMPLETE THIS WORK OVER THE NEXT 2 YEARS. WE WILL TAKE HALL TO HALL BOOK SIGNS WITH RECIPROCATING LOCALS.
*LU-915 TAMPA, FL*
WORK IS GOOD IN THE AREA & CALLS ARE GOING INTO BOOK 2.HOSPITAL PROJECT HAS FINALLY BROKE & MILLER ELECTRIC HAS OPEN CALLS FOR THE FAWCETT MEMORIAL HOSPITAL IN PORT CHARLOTTE WORKING 7-12'S ALONG WITH OTHER HOSPITAL WORK IN THE JURISDICTION. THERE IS OTHER COMMERCIAL WORK IN THE TAMPA AREA AS WELL, WORKING OVERTIME AS IS THE SUNSEEKER RESORT IN PORT CHARLOTTE. POWERHOUSE WORK ALSO COMING & THAT IS EXPECTED TO BE WORKING OVERTIME AS WELL.CALL HALL FOR DETAILS.
*LU-1426 GRAND FORKS, ND*
LOCAL IS A WALKTHROUGH WITH CALLS IN THE GRAND FORKS, FARGO & FERGUS FALLS AREAS. MULTIPLE CALLS FOR A SOLAR PROJECT LASTING ONE YEAR (WORKING 4-10'S & AN 8) & A HOSPITAL LASTING 2 YEARS (WORKING 5-10'S W/POSSIBLE OVERTIME). MORE LARGE SCALE PROJECTS STARTING SOON. VISIT WEBSITE AT1426.orgFOR FULL LIST. ND OR MN STATE LICENSE REQUIRED, DEPENDING ON PROJECT.
*LU-1516 JONESBORO, AR*
LOCAL IS BUSY WITH MAJOR $3 BILLION DOLLAR EXPANSION TO THE BIG RIVER STEEL PROJECT. CVE WORKING 5-10'S AS WELL AS PAYING $100/DAY INCENTIVE IF YOU LIVE 75 MILES FROM SITE OR PERDIEM IF YOU LIVE FARTHER. ORIENTATION OCT 21ST, SHUTDOWN START OCT 24TH-28TH. THERE IS ALSO A 7 DAY SHUTDOWN ONGOING AT NUCOR YAMATO THAT REQUIRES AR ELECTRICAL LICENSE, LONG SLEEVES, STEEL TOED BOOTS & PAYING $75/DAY PER DIEM .CACHE VALLEY ELECTRIC IS AT NUCOR YAMATO STEEL, NUCOR HICKMAN & BIG RIVER STEEL. OTHER LOCAL WORK AVAILABLE AS WELL. BOOKS MAY BE SIGNED IN PERSON OR FAX FROM HOME LOCAL. FAXSIGN IN REQUIRES CURRENT TRAVEL LETTER THAT MUST BE NOTARIZED WITH INITIATION DATE, CARD #, FULL SS #, STATE YOU HAVE 8000 HRS IN THE TRADE & DATE DUES ARE PAID THRU ALONG WITH A PAID UP DUES RECEIPT. THE LETTER WILL GET YOU YOUR TEMPORY JW LICENSE WITH A $25 CHECK OR MONEY ORDER IF YOU GET A CALL. LICENSE WILL BE GOOD FOR 6 MONTHS.CALL HALL FOR DETAILS.
UNFILLED INSIDE CALLS BY DISTRICTS AS OF DEC 6, 2022
ALWAYS CALL FIRST!
2ND DISTRICT:
LU-99 PROVIDENCE, RI
LU-300 SOUTH BARRINGTON,VT
LU-490 CONCORD, NH
LU-567 AUGUSTA, ME
LU-1253 AUGUSTA, ME
3RD DISTRICT:
LU-43 SYRACUSE, NY
4TH DISTRICT:
LU-26 WASHINGTON, DC
LU-82 DAYTON, OH
LU-141 WHEELING, WV
LU-369 LOUISVILLE, KY
LU-466 CHARLESTON, WV
LU-575 PORTSMOUTH, OH
LU-683 COLUMBUS, OH
LU-816 PADUCAH, KY
LU-1105 NEWARK, OH
5TH DISTRICT:
LU-194 SHREVEPORT, LA
LU-346 MIAMI, FL
LU-446 MONROE, LA
LU-480 JACKSON, MS
LU-505 MOBILE, AL
LU-558 SHEFFIELD, AL
LU-606 ORLANDO, FL
LU-728 FT LAUDERALE, FL
LU-915 TAMPA, FL
LU-995 BATON ROUGE, LA
6TH DISTRICT:
LU-16 EVANSVILLE, IN
LU-131 KALAMAZOO, MI
LU-153 SOUTH BEND, IN
LU-158 GREEN BAY, WI
LU-159 MADISON, WI
LU-242 DULUTH, MN
LU-294 HIBBING, MN
LU-388 STEVENS POINT, WI
LU-577 APPLETON, WI
LU-649 ALTON, IL
LU-668 LAFAYETTE, IN
7TH DISTRICT:
LU-20 DALLAS/FT WORTH, TX
LU-271 WICHITA, KS
LU-479 BEAUMONT, TX
LU-520 AUSTIN, TX
LU-527 GALVESTON, TX
LU-570 TUCSON, AZ
LU-602 AMARILLO, TX
LU-611 ALBUQUERQUE, NM
LU-640 PHOENIX, AZ
LU-661 HUTCHINSON, KS
LU-716 HOUSTON, TX
LU-1141, OKLAHOMA CITY, OK
8TH DISTRICT:
LU-12 PUEBLO. CO
LU-111 GRAND JUNCTION, CO
LU-113 COLORADO SPRINGS, CO
LU-233 HELENA, MT
LU-291 BOISE, ID
LU-322 CASPER, WY
LU-449 POCATELLO, ID
LU-532 BILLINGS, MT
9TH DISTRICT:
LU-48 PORTLAND, OR
LU-112 KENNEWICK, WA
LU-191 EVERETT, WA
LU-280 TANGENT, OR
LU-428 BAKERSFIELD, CA
LU-477 SAN BERNARDINO, CA
LU-659 MEDFORD, OR
LU-932 COOS BAY, OR
LU-1547 ANCHORAGE, AK
10TH DISTRICT:
LU-379 CHARLOTTE, NC
LU-429 NASHVILLE, TN
LU-495 WILMINGTON, NC
LU-1516 JONESBORO, AR
11TH DISTRICT:
LU-1 ST LOUIS, MO
LU-13 BURLINGTON, IA
LU-22 OMAHA, NE
LU-231 SIOUX CITY, IA
LU-265 LINCOLN, NE
LU-288 WATERLOO, IA
LU-347 DES MOINES, IA
LU-426 SIOUX FALLS, SD
LU-453 SPRINGFIELD, MO
LU-714 MINOT, ND
LU-1426 GRAND FORKS, ND
LU-1 ST LOUIS, MO(12-10)
LOCAL IS HOLDING STEADY. CALLS FOR NGA HAS SLOWED DOWN, BUT THERE IS STILL A SUBSTANTIAL AMOUNT OF WORK TO BE DONE ON THE PROJECT. IT IS UNDER THE NATIONAL CONSTRUCTION AGREEMENT WORKING 6-8'S PAYING $43.56 & HAS PERSONAL SICK DAYS FOR EVERY 30 HRS WORKED. THIS IS A GOVERNMENT FACILITY THAT REQUIRES A BACKGROUND CHECK. THE BJC QUEENY TOWER EXPANSION IS STILL A WAS OUT FROM HIRING WIREMEN & THE CONVENTION CENTER REMODEL/EXPANSION IS ALSO IN THE EARLY PHASE 1 STAGE WITH A HANDFUL OF WIREMEN ONSITE. THE BIG MEAT PROCESSING PLANT IS IN SITE PREPARATION PHASE &THE GM SHUTDOWN IS SCHEDULED TO START DECEMBER 17TH. IT IS SCHEDULED TO RUN FOR 5 WEEKS & IT IS SUPPOSABLY THE LAST BIG SCHEDULED SHUTDOWN FOR THE EXPANSION THAT WERE PREVIOUSLY DONE. SACHS HAS PUT IN CALLS FOR PRE-OUTAGE WORK BEFORE THE SHUTDOWN & IS EXPECTED TO HIRE MORE BEFORE IT BEGINS.PAYNECREST NOT LIKELY TO PUT CALLS IN UNTIL RIGHT BEFORE THE SHUTDOWN. CALL HALL FOR DETAILS.
LU-13 BURLINGTON, IA(12-10)
WORK IS STILL GOOD IN THE AREA. NO REALLY LARGE PROJECTS, BUT CALLS HAVE BEEN STEADY. THERE IS A 150 MW SOLAR PROJECT SCHEDULED TO START IN LATE SPRING & CARGILL IN EDDYVILLE HAS ANOTHER PHASE OF THE SURFER PROJECT COMING OUT FOR BID NEXT YEAR THAT WILL REQUIRE A LARGE AMOUNT OF MANPOWER. ALOS TALKS OF SOME OTHER VERY LARGE JOBS COMING LATER IN 2023 AT IOWA ARMY AMMUNITIONS PLANT IN MIDDLETOWN THAT IS EXPECTED TO LAST INTO 2026, AS WELL AS A MAINTENANCE SHUTDOWN NEXT SUMMER AT THE IOWA FERTILIZER PLANT IN WEVER.CALL HALL FOR DETAILS.
LU-16 EVANSVILLE, IN(12-10)
THE TOYOTA PLANT IN PRINCETON HAS AN OUTAGE SCHEDULED FOR DECEMBER 23RD TO DECEMBER 30TH (NOT WORKING CHRISTMAS DAY). EXPECT TO BE SEEING SHORT CALLS COMING IN SOON FOR THIS OUTAGE. BMWC HAS BEEN AWARDED PROJECT AT THE ALCOA/KAISER FACILITY IN NEWBURGH. THE PROJECT HAS STARTED & CONTRACTOR WILL BE PLACING MANPOWER CALLS AS NEEDED. STATE GROUP MAY HIRE A FEW MORE FOR 6-7 MONTH PROJECT AT THE GM PLANT IN BEDFORD THAT MIGHT START AS EARLY AS THIS MONTH. THE GM PLANT HAS AN EXPANSION PLANNED FOR THE NEAR FUTURE. LOCAL HAS QUITE A BIT OF WORK ON THE HORIZON, BUT SEVERAL SOLAR FARMS THAT WERE ANTICIAPTED TO START SOON HAVE BEEN DELAYED, POSSIBLE A YEAR, DUE TO SUPPLY & PANEL SHORTAGES. THERE ARE STILL SEVERAL UPCOMING SOLAR PROJECTS IN THE JURISDICTION, ONE IN PIKE COUNTY AND ONE IN WARRICK COUNTY, TWO IN GIBSON COUNTY & TWO IN POSEY COUNTY. THE COAL TO DIESEL PLANT IN DALE IS STILL A GO, BUT UNCERTAIN OF A START DATE AT THIS TIME. THE TOYOTA PLANT IN PRINETON HAS SLATED $800 MILLION DOLLARS TO ADD TWO NEW SUV LINES TO THEIR CURRENT LINE UP. WHILE NO START DATE ON PROJECT, WORKS ALREADY LOOKS TO BE UNDERWAY, PRIMARY ON WEEKENDS. ADDITIONAL WORK INCUDES THE CRANE NAVEL BASE IN CRANE, FERTILIZER PLANT & OTHER LOCAL PROJECTS. CALL HALL FOR DETAILS.
LU-20 DALLAS/FT WORTH, TX(12-10)
LOCAL HAS BEEN VERY STEADY THE LAST FEW MONTHS WITH CALLS GOING UNFILLED DAILY.THERE ARE CE/CW CALLS AS WELL. WORK PICTURE IS STILL STEADY, BUT A LITTLE SLOWER. ALTERMAN HAS WORK AT THE WYLIE TREATMENT PLANT, PDK INVESTMANT HAS WORK AT THE CRESCENT IN DALLAS & CONTI HAS SHORT TERM WORK AT GM.CONTI HAS A CHRISTMAS SHUTDOWN COMING UP AT GM THAT IS EXPECTED TO CALL FOR 100 WIREMEN & PAYING $10 OVER SCALE. CALLS SHOULD START COMING IN DEC 15TH WITH THE SHUTDOWN SCHEDULED TO START DEC 24TH & LAST ABOUT A WEEK.MORE CALLS FOR FREEMAN ANTICIPATED FOR THE 2ND WEEK OF JAN ATTHE WYLIE WATER TREATMENT PLANT. CALL HALL FOR DETAILS. STATE LICENSE REQ ON MOST PROJECTS.
LU-22 OMAHA. NE(11-2)
LOCAL NEEDS HELP!!!AREA HAS BEEN STRUGGLING TO FILL CALLS AT BOTH DATA CENTERS, FACEBOOK IN SPRINGFIELD, NE & GOOGLE IN PAPILLION, NE. PAYNECREST CALLS FOR FACEBOOK ARE IS WORKING 5-9'S & AN 8 WITH MILLER CALLS FOR GOOGLE WORKING 5-10'S & AN 8 ON SATURDAY WITH GOOGLE ALSO REQUIRING A BACKGROUND CHECK. BOTH PROJECTS HAVE VOICED THEIR CONCERNS ON MANPOWER FOR THEH FUTURE EXPANSION OF BUILDINGS ON THEIR SITES. THEY ALSO HAVE A $139 MILLION DOLLAR HIGH SCHOOL IN GRETNA, NE, HAVE BEEN AWARDED THE NEW SARPY COUNTY GOOGLE PROJECT THAT IS LOCATED NEAR DATA CENTER AND ALSO AWARDED WORK ON A NEW $53 MILLION DOLLAR WATER PARK IN GRETNA, NE. THAT ALONG WITH THE WORK AT THE DATA CENTERS SHOULD GENERATE A LOT OF WORK FOR LOCAL MEMBERS AS WELL AS TRAVELING BROTHERS & SISTERS. THE AMAZON PROJECT WITH ECA WILL BE COMING TO AN END SOON.WHEN THE CALLS ARE LISTED AS "JW ELECTRICAL LICENSE" IT MUST BE A CLASS A LICENSE. IF THE CALLS ARE LISTED AS SIMPLY "ELECTRICAL LICENSE", AN UNCLASSIFIED IOWA LICENSE & NEBRASKA APPRENTICE LICENSE ARE ACCEPTABLE. NEBRASKA APPRENTICE LICENSE ARE AVAILABLE AT THE HALL FOR $23 GOOD FOR 1 YEARS SO LONG AS YOU HAVE NEVER HAD ONE PREVIOUSLY.CALLS ON THE COUNCIL BLUFF SIDE MUST HAVE IOWA STATE LICENSE OR UNCLASSIFIED LICENSE, STEEL TOED BOOTS, OSHA-10 WITHIN THE LAST 5 YEARS IN HAND & CURRENT DUES RECIEPT TO PICK UP REFERRAL. ALL OTHER LOCAL CALLS REQUIRE A NEBRASKA STATE LICENSE BUT AN APPRENTICE LICENSE IS AVAILABLE AT THE HALL.
LU-34 PEORIA, IL(12-16)
WORK CONTINUES TO BE BUSY THROUGHOUT THE JURISDICTION. THE CANCER CENTER IN DOWN TOWN PEORIA IS ENCLOSED & WILL BE A NICE WARM JOB FOR THE WINTER MONTHS. COMMUNITY SOLAR FARMS (2MW) THAT WERE SCHEDULED TO START IN THE FALL, BUT HAVE BEEN PUSHED BACK TO NEXT YEAR. THERE ARE MULTIPLE SOLAR & WIND FARMS THAT ARE STILL PLANNED FOR THE COMING YEAR AND INTO 2024. BUILDING SHELL & PARKING LOT IS MOVING AHEAD & WITH THE PROTON VAULT AND THE BUILDING IS ONGOING. THERE ARE ALSO PLANS TO BUILD A 100 BED MENTAL HEALTH FACILTY IN PEORIA AS WELL AS A NEW CONTROL TOWER AT THE PEORIA INTERNATIONAL AIRPORT. THE AMAZON FULFILLMENT CENTER IN PEKIN IS WINDING DOWN & WILL FREE UP SOME LOCAL MANPOWER SOON AND MOST MEMBERS WORKING AT CATERPILLAR FACILITIES & THE CANCER CENTER ARE WORKING PLENTY OF OVERTIME. THE VA CLINIC IN QUINCY IS RAMPING UP & WILL NEED HELP FROM BOOK 2 TO GET IT COMPLETED ON TIME. UNFILLED CALLS IN AREA RANGE FROM 40/HR SERVICE WORK TO 60+ HR INDUSTRIAL WORK. CALL HALL FOR DETAILS.
LU-38 CLEVELAND, OH(12-10)
WORK OUTLOOK REMAINS VERY STRONG.LOCAL PUTTING TRAVELERS OUT CONSISTENTLY FOR LAKE ERIE ELECTRIC AT CLEVELAND CLIFFS STEEL MILL. SHERWIN WILLIAMS RESEARCH & DEVELOPMENT CREW SIZE SHOULD INCREASE BY 100 WIREMEN OVER THE NEXT 6 MONTHS. SHERMIN WILLIAMS 35 STORY HQ HAS STARTED AS WELL. CLEVELAND CLINIC HAS OVER $1 BILLION SLATED FOR CONSTRUCTION & HAVE REDUCED BADGING REQUIREMENTS FOR NEW CONSTRUCTION. METRO HOSPITAL & UNIVERSITY HOSPITAL HAS OVER 2 MILLION SQ FT OF NEW CONSTRUCTION STARTED & WILL CONTINUE OVER THE NEXT FEW YEARS. CLEVELAND CLINIC REQUIRES BADGING, ICRA, & MUST BE VACCINATED TO WORK ON ANY CCF PROPERTIES. OTHER PROJECTS SLATED FOR 2023 INCLUDE CHARTER STEEL, GUARDIANS STADIUM, CENTENNIAL BUILDING, UNIVERSITY HOSPITA & SEVERAL RESIDENTIAL/MIXED USE DEVELOPMENTS THROUGHOUT THE JURUSDICTION.MUST SIGN IN PERSON WITH A YEARLY RESIGN IN FEBRUARY. CALL HALL FOR DETAILS.
LU-41 BUFFALO, NY(12-10)
LOCAL IS BUSY AT THIS TIME. GREAT LAKES CHEESE PLANT HAS JUST STARTED & THERE IS A PLANNED 2023 SPRING START ON A NEW BUFFALO BILLS STADIUM. CALL HALL FOR DETAILS.
LU-82 DAYTON, OH(12-16)
WORK HAS BEEN STEADY IN THE AREA. A LOT OF WORK COMING INCLUDING AN ADDITION AT ABBOTT LABS, LARGE WAREHOUSE FRO KENDALL DISTRIBUTION, ROYAL CANIN DOG FOOD PLANT, STEM SCHOOL & WORK AT WRIGHT PATTERSON AIR FORCE BASE. THERE IS ALSO A FAB SHOP IN THE JURISDICTION ONGOING TO SUPPORT FACEBOOK & GOOGLE PROJECTS IN OTHER SURROUNDING LOCALS. CALL HALL FOR DETAILS.
LU-153 SOUTH BEND, IN(12-8)
LOCAL 153 IS STEADY!THERE ARE NUMEROUS OPEN CALLS FOR TELECOMMUNICATIONS. LOCAL CONTRACTORS CALLS ARE TRICKLING IN, LOOKING TO RAMP UP AFTER THE HOLIDAYS. HONEYSUCKLE SOLAR PROJECT SHOULD START HIRING IN A FEW WEEKS (WEATHER PENDING). AWAITING ANNOUNCMENT OF BATTERY PLANT, ANTICIPATING SPRING START. MEMORIAL HOSPITAL IS STALLED DUE TO MECHANICAL MATERIAL COMPLICATIONS, HOPEFULLY SPRING START. HALL SHOULD HAVE MORE INFORMATION FOLLOWING THE HOLIDAYS.
LU-233 HELENA, MT(10-16)
WORK IS REMAINS STEADY IN THE AREA. WORK INCLUDES 40 HR/WEEK COMMERICAL WORK & RESIDENTIAL IN BUTTE AND SOME LOCAL INDUSTRIAL WORK AS WELL. ALL HALL FOR DETAILS. STATE LICENSE REQUIRED ON MOST PROJECTS.
LU-234 CASTROVILLE, CA(10-16)
WORK IS GOOD IN THE AREA. THERE ARE 2 JOBS ONGOING AT POWER PLANT AT MOSS LANDING FOR THE 350 MW BATTERY BACKUP PROJECT. CA STATE CERTIFIED PREFERRED, BUT MAY TAKE A TRAINEE CARD IF EXPERIENCED IN BATTERY. LOOKING TO TOP OUT AT ABOUT 120 WIREMEN. CALL HALL FOR DETAILS.MOST CALLSREQUIRE A STATE LICENSE OR A STATE CERT (CA) OR TRAINEE CARD. DRUG TEST WILL BE ONSITE.MOST OTHER CALLS MUST HAVE A CALIFORINA STATE CERTIFICATION & WILL BE DRUG TESTED. NEED A CURRENT DUES RECEIPT & TRAVEL LETTER TO SIGN BOOK & THERE IS A 3 STRIKE RULE IN EFFECT. CAN GET ON THE BOOKS BY GOING TO:ibewlocal234.org
LU-306 AKRON, OH(11-30)
LOCAL IS BUSY & CALLS ARE GETTING INTO BOOK 2. MOST JOBS WORKING 40 HRS, BUT THERE IS SOME SCATTERED OVERTIME. CALL HALL FOR DETAILS.
LU-347 DES MOINES, IA(6-4)
LOCAL IS BUSY & HAS MULTIPLE UNFILLED CALLS FOR SOME TIME NOW!FACEBOOK HAS 2 BUILDINGS IN ALTOONA & MICROSOFT CURRENTLY ALSO HAS 3 PROJECTS UNDERWAY WITH MOST ALL THESE ARE WORKING OVERTIME. HOSPITAL JOB IS UNDERWAY & APPLE IS SLOWLY TRYING TO GET STARTED, MOST LIKELY NOT UNTIL FALL. LOCAL STILL HAS A COUPLE HUNDRED TRAVELING BROTHERS & SISTERS WORKING IN THE AREA. EXPECTING WORK TO BE IS EXPECTED TO BE BUSY ALL SUMMER. AN IOWA UNCLASSIFIED LICENSE IS GOOD FOR MOST CALLS & IS AVAILABLE FOR $20 FOR THE YEAR, WHICH IS ALSO PRO-RATED DEPENDING ON WHEN YOU AQUIRE IT. CALL HALL FOR DETAILS.
LU-357 LAS VEGAS, NV(7-22)
UNFILLED CALLS WEEEKLY.CALLS GOING TO LAS VEGAS STRIP PROJECTS UNFILLED. LOCAL'S TWO UTILITY SCALE SOLAR PROJECTS (GEMINI & YELLOW PINE) ARE GOING TO BOOK 2 SOON. FONTAINEBLEAU AND MSG SPHERE WILL NOT OPEN UNTIL SUMMER/FALL OF 2023. LOW VOLTAGE CALLS GOING DEEP INTO BOOK 2. ALL SOLAR CALLS REQUIRING A PV (PHOTOVOLTAIC) CERTIFICATION. THIS IS A TEST REQUIRED CERTIFICATION THAT COST $25 AND WILL BE ADMINISTERED BY NEVADA OSHA. YOU CAN GO TO THEIR WEBSITE OR LOCAL'S WEBSITE TO FIND AVAILABLITY FOR TESTING TO ACQUIRE THIS CERT. TESTING NEEDS TO BE SCHEDULED 4 TO 6 WEEKS PRIOR TO TAKING A CALL IN VEGAS. CALL HALL FOR DETAILS.
LU-388 STEVENS POINT, WI(9-24)
WORK IS GOOD IN THE AREA. LOCAL HAS A LARGE SOLAR PROJECT THAT IS IN NEED OF WIREMEN. CALL HALL FOR DETAILS.
LU-426 SIOUX FALLS, SD(9-24)
LOCAL IS AT FULL EMPLOYMENT AT THIS TIME & EXPECTED TO REMAIN THAT WAY FOR THE FORESEEABLE FUTURE. MOSTLY COMMERCIAL WORK WITH A FEW ACTIVE WIND FARMS AS WELL. PROPOSED INDUSTRIAL WORK HAS BEEN PUSHED BACK FOR NOW, BUT WILL UPDATE AS INFORMATION IS AVAILABLE. MEMBERS CAN GO TO APP STORE & DOWNLOAD "UNION WORKS" & PICK LOCAL 426 TO VIEW CALLS. MOST ALL CALLS REQUIRE A CITY OF SIOUX FALLS & SOUTH DAKOTA STATE JOURNEYMAN LICENSE.
LU-429 NASHVILLE, TN(9-20)
WORK IS STEADY IN THE AREA,. THERE ARE A COUPLE OF UPCOMING OUTAGES IN THE FALL. THE FIRST IS AT TVA GALLATIN THAT WILL BE STARTING THE 1ST OF SEPTEMBER & EXPECTED TO LAST 75 DAYS WORKING OVERTIME. THE NEXT WILL BE AT CUMBERLAND CITY & WILL START AT THE END OF SEPTEMBER & EXPECTED TO LAST ABOUT 75 DAYS WORKING OVERTIME AS WELL. TVA IS STARTING TO MAN UP & THERE IS ALSO WORK AT NEW JOHNSONVILLE WHICH WILL START HIRING IN OCT. THERE IS SOME UPCOMING WORK IN TULLAHOMA AT THE BASE WITH ALL THESE PROJECTS REQUIRING A BACKGROUND CHECK. ROSENDIN STILL PUTTING CALLS IN FOR WOOLHAWK DATA CENTER WORKING 6-10'S. GM SPRINGHILL JOB IS ONGOING & STILL MANNING UP. CONTRACTORS ARE PICKING UP WORK. PROJECT WORKING 5-10'S & EXPECTED TO LAST ANOTHER 2 YEARS WITH NEW PAINT SHOP, NEW BATTERY PLANT AND ONGOING WORK INSIDE THE PLANT. THE MPEC CENTER IN CLARKSVILLE WORKING 4-10'S W/POSSIBLE OVERTIME. MEMBERS CAN GET ON BOOKS BY FAX FROM HOME LOCAL WITH CURRENT TRAVEL LETTER, A COPY OF PAID UP DUES RECIEPT, A GOOD WORKING PHONE NUMBER AND SS#. MEMBERS CURRENTLY ON THE OUT OF WORK LIST CAN CHECK THEIR POSITION VIA THE WEBSITE:ibew429.org THERE IS ALSO ACCESS TO CHECK THE JOB BOARD, BID ON CALLS AS WELL AS MONTHLY RESIGN.WEBSITE UPDATES EVERYDAY AROUND 5PM FOR NEW & LEFTOVER CALLS.
LU-444 PONCA CITY, OK(10-14)
WORK IN THE LOCAL HAS BEEN STEADY. REFINERY HAS END OF YEAR PROJECTS WITH CALLS AVAILABLE WORKING 5-10'S. DRUG TEST/BACKGROUND CHECK & TWIC CARD REQUIRED.CALL HALL FOR DETAILS.
LU-453 SPRINGFIELD, MO(9-24)
THERE IS A 10 MAN OPEN CALL IN ZONE 2 FOR COASTAL WORKING ON A MILITARY BASE NEW HOSPITAL. THERE ARE ALSO SCATTERED CALLS FOR OTHER WORK IN OTHER PARTS OF THE JURISDICTION. CALL HALL FOR DETAILS.
LU-477 SAN BERNARDINO, CA(10-4)
LOCAL IS AT FULL EMPLOYMENT & WILL BE NEEDING HELP. MOST CALLS ARE NOW GOING THROUGH BOOK 2 & SOME DAYS AS FAR AS BOOK 4. THERE ARE 2 SOLAR PROJECTS THAT HAVE WAIVED THE STATE LICENSE. ONE OF THEM IS IN ZONE A ($48.20/HR) AND ONE IS IN ZONE B ($63.80) WITH A DURATION OF ABOUT 10 MONTHS ON THESE PROJECTS.DAGGETT SOLAR PROJECT IS ABOUT PEAKED MANPOWER AT 350 WIRMEN WITH ABOUT 2 YEARS LEFT ON THIS 650 MW. STILL A LOT OF WORK IN CHINA LAKE NAVY WEAPONS FACILITY ALSO. THESE SITES DO REQUIRE A STATE CERTIFICATION CURRENTLY, BUT MAY BE WAVED IN THE FUTURE. HOUSING IS PAID FOR BY THE BASE WITH A BACKGROUND CHECK REQUIRED THAT TAKES ABOUT 3 WEEKS TO COMPLETE WITH A 2-3 YEAR DURATION LEFT ON THE PROJECT. THERE ARE ALSO 3-4 MORE SMALLER 150-200MW UTILITY SCALE SOLAR PROJECTS JUST BREAKING GROUND NOW. ALL 3 OF THESE ARE IN ZONE A WITH EACH REQUIRING 100-150 WIREMEN WITH A YEAR DURATION AFTER THEY START. OTHER LOCAL WORK ONGOING AS WELL INCLUDING COMMUNITY COLLEGE JOB STARTING UNDERGROUND ($13 MILLION DOLLAR ELECTRICAL WITH A 2-3 YEAR DURATION) AND STATE COLLEGE ($16 MILLION DOLLAR ELECTRICAL). MOST CALLS REQUIRE A CA STATE LICENSE. CALL HALL FOR DETAILS.
LU-481 INDIANAPOLIS, IN(9-26)
WORK IS GETTING BUSY. MOST CALLS ARE 40 HR/WEEK CALLS. HIRING SHOULD START IN NOVEMBER FOR PROJECT SANTA IN FISHERS (UPDATE SOON ON SCHEDULE AND HOURS) WORK WILL CONTINUE AT THE CRIMINAL JUSTICE CAMPUS AND FEDEX AT THE AIRPORT, PAN AM PLAZA HOTEL DOWNTOWN AND THE BIG 1.6 BILLION DOLLAR IU METHODIST HOSPITAL TOWER. ADDITIONALLY, 325 MILLION EXPANSION OF ST. VINCENT HOSPITAL WORK SHOULD START IN OCTOBER/NOVEMBER ON NEW PET FOOD PLANT IN RUSHVILLE IN CALL JOBLINE FOR MORE DETAILS-(317)923-2596AFTER 4:30 PM. LOCAL 481 REFERRAL IS BEING HANDLED ELECTRONICALLY AT THIS TIME. SIGN BOOK 2 WITH A FAX FROM YOUR HOME LOCAL LETTERHEAD. THE MEMBER’S BASIC PAGE WITH LPE WITH ALL INFORMATION THAT THE MEMBER IS NOT WORKING & IN GOOD STANDING.LOCAL481 HAS IN PERSON RESIGN
LU-490 CONCORD, NH(9-26)
WORK IS STARTING TO PICK UP AGAIN. LOCAL HAS HAD SOME OPEN CALLS FOR PHARMACEUTICALS PROJECT THAT IS A GOOD INSIDE JOB THAT IS EXPECTED TO LAST THRU THE WINTER. OTHER PROJECTS CONSIST OF SOME SOLAR, BUT MOST OF IT IS TRADITIONAL ELECTRICAL WORK.CALL HALL FOR DETAILS.
LU-508 SAVANNAH, GA(9-27)
LOCAL HAS BEEN WORKING ON FILLING CALLS FOR SAVANNAH AREA. THERE IS A OUTAGE AT PLANT HATCH COMING UP IN JANUARY AS WELL AS SOME WORK COMING AT THE GEORGIA PORTS.CALL HALL FOR DETAILS.
LU-531 LA PORTE, IN(6-10)
LOCAL HAS UNFILLED CALLS & NEEDS HELP!!!MJ ELECTRIC WORKING AT CLEVALAND CLIFFS-BURNS HARBOR & POSSIBEL OTHER INDUSTRIAL SITES. THESE ARE LONG CALLS, 3-6 MONTHS WORKING SPOTTY OVERTIME. THERE ARE ALSO CALLS FOR AUSTGEN ELECTRIC WORKING 40/HR WEEKS AT I-65 WELCOME CENTER FOR AT LEAST 2 MONTH DURATION, BUT POSSIBLY LONGER. WILL BE NEEDING MORE WIREMEN FOR LARGE 700 MW SOLAR FARM IN WHEATFIELD WITH CALLS COMING IN ALMOST WEEKLY. NICTD DOUBLE TRACK PASSENGER RAIL EXPANSIONPROJECT NEEDS HANDS FOR 2-4 MONTH DURATION WORKING 5-10'S & WILL BE LOOKING TO HIRE 15-20 WIREMEN. THIS RAIL EXPANSION IS FOR THE SOUTH SHORE LINE FROM SOUTH BEND TO CHICAGO. THE BULK OF THIS WORK WILL BE OUT OF LU 697 JURISDICTION & SHOULD LAST 3 YEARS WITH TRAIN STATIONS, PARKING GARAGES, ETC. PROJECT IS ALSO ALLOTING 300 ACRES PER TRAIN STATION FOR BUSINESS DEVELOPMENT WHICH SHOULD BE POTENTIAL FOR MORE WORK. LOCAL ALSO HAS 2 YEARS WORTH OF SCHOOL WORK THAT IS SCHEDULED TO START LATE APRIL/MAY. THIS IS A$180 MILLION DOLLAR PROJECT TO BUILD 3-4 NEW SCHOOLS IN CHESTERTON AND HEAVY REMODEL OF THE ONES NOT BEING TORN DOWN. $400 MILLION DOLLAR PRISON JOB NOT EXPECTED TO START UP UNTIL LATE THIS YEAR OR THE BEGINNING OF 2023. CALL HALL FOR ANY DETAILS.
LU-532 BILLINGS, MT(10-4)
WORK HAS SLOWED DOWN SOME THE LAST FEW WEEKS. LOCAL STILL HAS A FEW OPEN CALLS AROUND MOSTLY SERVICE WORK & VARIABLE SMALL JOBS. WORK IS THE BOZEMAN AREA EXPECTED TO PICK UP, BUT VERY EXPENSIVE IN THE AREA & NO SUB PAY. BILLINGS AREA IS GOING TO GET BUSY BY THE END OF NOVEMBER. R.I.C.E. (RECIPROCATING INTERNAL COMBUSTION ENGINE) PLANT IN LAUREL HAS STARTED AN ANTICIPATING NEEDING ANOTHER 100 WIREMEN ON IT BEFORE SPRING. A LOT OF OTHER WORK COMING UP AROUND THE BILLINGS & EASTERN MONTANA AREA AS WELL.CALL HALL FOR DETAILS OR INFORMATION ON TWIC AND C-STOP REQUIREMENTS.ALL CALLS REQUIRE A MONTANA STATE LICENSE.
LU-545 ST JOSEPH, MO(9-24)
WORK IS GOOD & LOCAL HAS BEEN VERY BUSY THE LAST FEW MONTHS. NO LARGE PROJECTS TO SPEAK OF, BUT ENOUGH SMALLER ONES TO KEEP BUSY. THERE ARE A COUPLE OF PROJECTS SCHEDULED TO START SOON. R/S ELECTRIC HAS HILLYARD CHEMICALS THAT'S BUILDING A LARGE WAREHOUSE THAT IS EVENTUALLY GOING TO BE IN PRODUCTION OVER TIME, SO IT SHOULD STRETCH OUT FOR A WHILE. ALBAUGH CHEMICALS IS ALSO ADDING ON & THAT IS EXPECTED TO BE A GOOD SIZED PROJECT AS WELL AS SOME OTHER SMALLER 10-15 MAN JOBS AROUND THE AREA. SOMECALLS DO REQUIRE A ST JOSEPH CITY LICENSE.CALL HALL FOR DETAILS.
LU-558 SHEFFIELD, AL(9-28)
META/FACEBOOK PROJECT IS STARTING TO INCREASE IN MANPOWER WITH CALLS COMING IN STEADILY. JOB IS LOCATED IN MADISON, AL & IS CURRENTLY WORKING 4-10'S & 2 8'S. NEWTRON IS ON THE TVA COLBERT SIMPLE CYCLE PROJECT IN TUSCUMBIA, AL. THIS IS A GAS TURBINE COMING OUT OF THE GROUND. PROJECT STARTED ABOUT 2 MONTHS AGO & HAS A 10 MONTH DURATION. JOB IS CURRENTLY WORKING 5-10'S W/OPTIONAL SATURDAYS. THERE ARE CURRENTLY 20 WIREMEN ONSITE & EXPECTED TO INCREASE TO 100 WIREMEN BY THE END OF OCTOBER. BELTLINE ELECTRIC & PETROTECH ALSO HAVE JOBS AT TVA COLBERT, CT. CALLS ARE COMING IN REGULARLY WITH PROJECT WORKING 6-10'S. STILL A FEW CALLS TRICKLING FOR TOYOTA/MAZDA, MOST WORKING 40 HRS. THERE ARE ALSO A FEW CALLS STILL FOR REFUELING OUTAGE AT BROWNS FERRY NUCLEAR PLANT FRO DAY & ZIMMERMAN WORKING 6-12'S. THE OUTAGE IS JUST STARTING & ANTICIPATED TO CUT BACK AT THE END OF OCTOBER. OTHER LOCALS CALLS GOING INTO BOOK 2 AS WELL AS OTHER TVA WORK AVAILABLE. CALL HALL FOR DETAILS.
LU-570 TUCSON, AZ(9-20)
OPEN JOB CALLS WORKING AT LOCAL AREA MINES, MUST HAVE MSHA. JOBS AT RAYTHEON, MUST HAVE ORIGINAL BIRTH CERTIFICATE. WORKING 5-10S. NO STATE LICENSE REQUIRED.
LU-573 WARREN, OH(11-22)
LOCAL HAS BEEN STAYING BUSY WITH THE ULTIUM CELLS BATTERY PLANT. THERE ARE MULTIPLE CONTRACTORS ONSITE INCLUDING LAKE ERIE ELECTRIC, CONTI, VEC, DICKEY ELECTRIC, GEM, HUNT/LIGHTHOUSE, T SQUARED& ELECTRICAL INSIGHTS. SOME OF THESE PROJECT'S AT ULTIUM CELLS WILL BE ANOTHER 12+ MONTHS. THERE IS A 1.2 BILLION DOLLAR COMBINED CYCLE NATURAL GAS POWER PLANT LOCATED IN LORDSTOWN, OH STARTING IN THE SPRING OF 2023. THERE IS A 240 BED CAMPUS STYLE HOSPITAL PROJECT THAT IS ANTICIPATED TO START SOMETIME IN 2023 AS WELL. WORK OUTLOOK WITH ALL UPCOMING PROJECTS, ALONG WITH OTHER RUMORED ONES, LOOKS TO KEEP THE AREA BUSY FOR A WHILE. THERE ARE A LOT OF HOTELS WITHING 20 MINUTES OF THE BULK OF THE WORK IN THE JURISDICTION. CALL THE HALL FOR DETAILS.
LU-611 ALBUQUERQUE, NM(11-18)
FACBOOK IS STILL ONGOING & HAS YEARS LEFT ON IT. EARLIER THIS YEAR, THEY BROKE GROUND ON 2 NEW BUILDINGS KEEPING 350-450 WIREMEN BUSY. WITH ALL THE WORK, THEY EXPECTED TO BE STRETCHED THIN & WILL NEED A LOT OF HELP FROM OUR TRAVELING BROTHERS & SISTERS. INTEL HAS BEEN A LITTLE SLOW AS OF LATE. DEMO FINISHED A FEW MONTHS BACK & TOO INSTALL HAS STARTED & THEY ARE ANTICIAPTING MORE CALLS IN THE NEAR FUTURE.PAYING $140/DAY INCENTIVE FOR TRAVELERS WITH A VERIFIED ADDRESS 75 MILES OR FURTHER FROM PLANT LOCATION ALONG WITH $4 AND HOURINCENTIVE & $25/DAY PER DIEM. JOB IS WORKING 5-10'S & SATURDAYS.LOS ALAMOS NATIONAL LABORATORY IS STILL GOING STRONG. THEY ARE ALSO PAYING $10 OVER SCALE WITH THEIR OWN CONTRACT & SCALE IS HIGHER THAN THE INTOWN $35.20 SCALE. THE MAINTENANCE SIDE IS $41.21 & CONSTRUCTION SIDE IS $41.40. COMPANY DOES HAVE THE RIGHT TO MOVE YOU FROM MAINTENANCE TO CONSTRUCTION AT WILL. THIS IS A LONG TERM JOB AS THEY PUT YOU IN FOR A SECURITY CLEARANCE (Q CLEARANCE) THAT IS PUT ON BY THE FBI & CAN TAKE A YEAR TO OBTAIN-YOU WILL BE ESCORTED UNTIL CLEARANCE IS CLEARED. THERE ARE SEVERAL AMENITIES IN THEIR CONTRACT, INCLUDING 20 HOURS/MONTH PTO, PAID HOLIDAYS, $200/YEAR FOR BOOTS, ETC. THERE ARE A LOT OF OTHER 40 HR WORK AROUND THE AREA AS WELL. NEED A NEW MEXICO STATE LICENSE (EE-98J) ORLOCAL DOES RECIPROCATE WITH THE FOLLOWING STATES: ALASKA, ARKANSAS, COLORADO, IDAHO, MONTANA, NEBRASKA, OKLAHOMA, SOUTH DAKOTA, UTAH, TEXAS & WYOMING. SIGNED IN PERSON. CONTACT THE HALL FOR ANY QUESTIONS OR FURTHER INFO.
OUTSIDE/LINEMEN -CALLS FOR DISTRIBUTION, POLE CHANGE OUTS, RE-CONDUCTOR, ETC. THE SUN ZIA PROJECT IS SCHEDULED TO START IN JUNE THAT CONSISTS OF PARALLEL 500 KVA TRANSMISSION LINE GOING TO PHOENIX & IS ESTIMATED TO BE OVER 600 MILES OF LINE. CALL HALL FOR DETAILS.
LU-640 PHOENIX, AZ(10-18)
LOCAL IS BUSY & NEEDS HELP!ROSENDIN ELECTRIC AT INTEL DATA CENTER IN CHANDLER, AZ IS NOW PAYING $5.00 OVER SCALE. CONTRACTORS ONSITE INCLUDE ROSENDIN, OREGON ELECTRIC, B&D AND SPECTRA. STURGEON ELECTRIC HAS A DATA CENTER WORKING 60/HR WEEKS & SOME SUNDAYS. TILDEN DATA CENTER IN EAST MESA NOW PAYING $7.00 OVER SCALE & WORKING 60/60/50 HR/WEEK SCHEDULE. MAZ DATA CENTER PAYING $8.00 OVER SCALE & WORKING 60 HR/WEEK SCHEDULE. LUCID MOTORS CASA GRANDE IS PAYING $75/DAY & WORKING 50/WEEKS WITH SOME SATURDAYS. THE KOLHER-VIKRELL PLANT JOB IN CASA GRANDE, AZ IS PAYING $75/DAY & WORKING 50 HR/WEEK SCHEDULE. THE PROJECT IS WORKING FIRST & SECOND SHIFTS. THE TSMC CHIP PLANT IS PAYING $5.00 OVERSCALE & WORKING 60/60/50 HR/WEEK SCHEDULE. CMC STEEL JOB IN APACHE JUNCTION, AZ IS WORKING 6-11'S & OPTIONAL SUNDAYS. THEY ARE ALSO PAYING AN ADDTIONAL $100/DAY. THE CHIP PLANTS ARE WORKING 60-60-50 SHIFTS. MOST OF THE DATA CENTERS ARE ALSO WORKING OVERTIME. MILKY WAY DAIRY IN MARICOPA PAYING $9.00 OVER SCALE. OTHER WORK INCLUDES BATTERY STORAGE FACILITIES, SOLAR PLANTS, HOSPITALS, OFFICE COMPLEXES & VARIOUS \COMMERICAL JOBS.NEED BROTHERS & SISTERS TO HELP MAN THIS WORK! CALL HALL FOR DETAILS.
LU-649 ALTON, IL(6-20)
LOCAL HAS CALLS FOR P66 REFINERY STARTING ON MONDAY JUNE 27TH & TUESDAY JULY 5TH. THE CALL FOR JUNE 27TH IS 8 JW'S & THE CALLS FOR JULY 5TH IS FOR 8 JW'S. BOTH CALLS ARE FOR 6 MONTHS WITH POSSIBLE OVERTIME. WORK AT REFINERY IS ONGOING. MOST CALLS REQUIRES OSHA 10 & SECURE FIT EXAM WILL BE REQUIRED. CALL HALL FOR DETAILS.
LU-659 MEDFORD, OR(10-20)
LOCAL IS STILL BUSY & HAS MULTIPLE OPEN CALLS IN THE AREA. PROJECTS INCLUDE NEW HOSPITAL TOWER BEING ADDED TO THE ASANTE HEALTH PAVILION IN MEDFORD FOR PEC ELECTRIC. JOB IS CURRENLY WORKING 4-10'S M-T WITH 8 HRS OVERTIME ON FRIDAY & PAYING $100/DAY INCENTIVE PAY. JOB IS EXPECTED TO LAST ANOTHER YEAR. PEC ALSO HAS CALLS FOR INSIDE THE HOSPITAL THAT REQUIRES PROOF OF VACCINATION. OTHER JOBS INCLUDE SERVICE & COMMERICAL WORK IN KLAMATH FALLS, WASTE WATER TREATMENTPLANT IN KLAMATH FALLS & MISC COMMERICAL. SWAN LAKE PUMPED STORAGE PROJECT IN KLAMATH FALLS HAS AN MOU TO BE UNION BUILT JUST COMING OUT OF THE GROUND. CALL HALL FOR DETAILS.OREGON LICENSED JOURNEYMEN WIREMEN REQUIRED OR THOSE ABLE TO RECIPROCATE, WHICH INCLUDE MONTANA, ARKANSAS, MAINE, WYOMING, UTAH, WASHINTON & IDAHO.
LU-673 PAINESVILLE, OH(10-20)
WORK IN THE AREA IS GOOD, AND WILL CONTINUE TO STAY THAT WAY AS WE HEAD INTO 2023. LAKE ERIE ELECTRIC HAS APPROXIMATELY 25 ELECTRICIANS OVER AT THE CLEVELAND CLINIC HOSPITAL IN MENTOR. THEY HAVE BEEN WORKING 5-10s AND AN 8. THEY ALSO SECURED ANOTHER NEW HOSPITAL TO BE BUILT IN ASHTABULA, WHICH IS SIMILAR SIZE. THEY WILL START NEEDING MANPOWER ON THAT PROJECT WITHIN THE NEXT COUPLE OF MONTHS. WE ALSO HAVE OUR NUKE OUTAGE COMING UP IN PERRY IN MARCH OF 2023. IT’S APPROXIMATELY A 30 DAY OUTAGE THAT’S ESTIMATED TO TAKE AROUND 50 ELECTRICIANS, AND PROMISES TO PROVIDE LOTS OF OVERTIME. WE WILL DEFINITELY BE RELYING ON OUR BOOK 2 BROTHERS AND SISTERS TO HELP US MAN THAT OUTAGE. THE LATEST UPDATE ON THE PIG IRON PLANT SAYS THAT WE WILL START SEEING MOVEMENT BY THE SECOND QUARTER OF 2023.
LU-676 PENSACOLA, FL(8-22)
WORK IS BUSY IN THE AREA. INTERNATIONAL PAPERMILL SHUTDOWN IN CANTONMENT FLORDIA COMING UP SEPT 5TH & 6TH. PAY RATE IS $25.58/HR PLUS BENEFITS WITH OVERTIME ANTICIAPTED. CALL HALL FOR DETAILS.
LU-683 COLUMBUS, OH(10-20)
LOCAL IS STILL VERY BUSY & EXPECTED TO REMAIN THAT WAY FOR THE NEXT SEVERAL YEARS.THE MUSTANG PROJECT IN NEW ALBANYWORKING 5-10'S & AN 8 ON SATURDAYS. CURRENTLY HAS ABOIT 400 WIREMEN ONSITE.OSU HOSPITAL, SOLAR FIELDS & OTHER LOCAL SMALLERCALLS FOR JIT'S (TELE/DATA) ALSO.LOCAL WILL NEED A LOT OF WIREMEN & LARGE CALLS GO TO THE BACK OF BOOK 2.CALL HALL FOR DETAILS.
LU-697 GARY-HAMMONDS, IN(11-18)
LOCAL EXPECTED TO REMAIN STEADY THE REST OF THE YEAR.CALLS HAVE SLOWED SOME, BUT ARE ANTICIAPTED TO CONTINUE TRICKLING IN. OUTAGE AT BP & US STEEL ARE COMPLETE. THE NEW FRANCISCAN HOSPITAL IN CROWN POINT IS MANNED UP FOR THE WINTER AND THE NEW UIC HOSPITAL IS SCHEDULED TO MAN UP NEXT YEAR. CARGILL & HUHTIMAKI ARE EXPECTED TO BE GOING STRONG THROUGH THE REST OF 2022. CALL HALL FOR DETAILS.
LU-700 FT SMITH, AR(11-22)
WORK IS VERY BUSY IN THE AREA & LOCAL HAVING A HARD TIME FILLING MANPOWER REQUESTS. SEVERAL UPCOMING PROJECTS OUT OF BID INCLUDING WALMART HOME OFFICE IN BENTONVILLE, FLINT CREEK POWER PLANT IN GENTRY, CASINO IN RUSSELLVILLE, AMAZON & NANTZE IN BENTONVILLE. CALL HALL FOR DETAILS.
LU-714 MINOT, ND(11-22)
LOCAL IS STILL STEADY IN BOTH MINOT & WILLISTON AREA.INCLUDESCOMMERICAL WORK, INDUSTRIAL WORK & BIT COIN DATA CENTER IN THE WILLISTON, ND AREA.OILFIELD SERVICE WORK, INDUSTRIAL WORK IN & AROUND WILLISTON AREA AS WELL AS INDUSTRIAL WORK IN WATFORD CITY & NEW TOWN.MOST CALLS REQUIRE A STATE LICENSE. CALL HALL FOR DETAILS.
LU-725 TERRE HAUTE, IN(11-22)
WORK IS GOOD IN THE AREA. THERE IS A 150 MW SOLAR PROJECT THAT HAS BROKEN GROUND ON THE CASINO & STEEL MILL PROJECTS. CATALENT FACILITY HAS A DECENT SIZED PROJECT THAT CONSISTS OF NEW PRODUCTION LINES FOR COVID VACCINE PACKAGING THAT IS PROJECT TO TO START AT THE FIRST OF THE YEAR. THE REFINERY IS ALSO EXPECTED TO MAN UP GOING INTO THE NEW YEAR, THERE IS MORE SOLAR WORK IN THE DOCKET & HERSHEY PLANT IN ROBINSON HAS A GOOD SIZED PROJECT AS WELL. CALL HALL FOR DETAILS.
LU-728 FT LAUDERDALE, FL(11-22)
WORK IS STEADY IS STILL STEADY IN THE AREA. THERE IS A NEW CONVENTION CENTER, HOTEL & PARKING GARAGE AS WELL AS HOSPITAL WORK. ST LUCIE NUCLEAR PLANT EXPECT TO HAVE WORK AFTER THE NEW YEAR. CALL HALL FOR DETAILS.
LU-816 PADUCAH, KY(11-22)
LOCAL IS STEADY AT THIS TIME WITH CALLS GOING INTO BOOK 2 WEEKLY. THERE IS A COMBUSTION CYCLE PROJECT GOING ON AT TVA PARADISE STEAM PLANT THAT IS WORKING 5-10'S. THERE ARE 2 CONTRACTORS ONSITE: MJ ELECTRIC & BELTLINE ELECTRIC WITH BOTH PAYING FULL INSIDE RATE AT $35/HR PLUS $100/DAY INCENTIVE PAY. PROJECT IS EXPECTED TO GO THROUGH THE SPRING OF 2023. LOTS OF OTHER WORK COMING AS WELL. THERE IS A BATTERY RECYCLING FACILITY THAT WILL RECYCLING MATERIALS FOR MAKING EV BATTERIES COMING TO HOPKINSVILLE, KY. LOOKING AT AN EARLY SPRING 2023 START & ANTICIPATING OVERTIME OUT OF THE GATE AS WELL AS NEEDING PLENTY OF WIREMEN FOR THIS PROJECT. LOOKING AT POSSIBLE WORK COMING AT CHEMICAL PLANTS IN CALVERT CITY, KY THIS SPRING THAT SHOULD ALSO NEED HELP FROM BOOK 2. CALL HALL FOR DETAILS.
LU-873 KOKOMO, IN(9-27)
WORK HAS PICKED UP CONSIDERABLY OVER THE SUMMER AND WE EXPECT AN EXTREMELY BUSY 2-3 YEARS. STELLANTIS & SAMSUNG ARE PARTNERING UP WITH A $3 BILLION INVESTMENT TO BUILD A 3 MILLION SQ FT BATTERY PLANT IN KOKOMO. SCHEDULES ARE STILL BEING DISCUSSED, BUT WE EXPECT 2 SHIFTS OF 6-10S STARTING SPRING OF 2023 WITH APPROX 500 ELECTRICIANS NEEDED. GM IS INVESTING $480 MILLION IN THE STAMPING PLANT IN MARION. WE ALSO EXPECT THIS JOB TO WORK 2 SHIFTS OF 6-10S STARTING LATE FALL 2022/EARLY SPRING 2023 WITH APPROX 100 ELECTRICIANS NEEDED. THE STELLANTIS AND GM JOBS WILL BOTH BE NMA JOBS WITH 100% PAY SCALE AND PER DIEM BEING DISCUSSED. WE ALSO HAVE AN ONGOING 200 MW SOLAR FARM IN CLINTON COUNTY WHICH WILL NEED ADDITIONAL MAPOWER. THIS IS A VERY GOOD BOOK TO SIGN AS WE WILL NEED SEVERAL HUNDRED TRAVELING BROTHERS/SISTERS TO COMPLETE THIS WORK OVER THE NEXT 2 YEARS. WE WILL TAKE HALL TO HALL BOOK SIGNS WITH RECIPROCATING LOCALS.
LU-906 MARQUETTE, MI(11-22)
LP PLANT JUST MANNED UP WITH ABOUT 25 TRAVELERS WORKING 5-10'S & AN 8, BUT IS EXPECTED TO GO 6-10'S SOON. ANTICIPATING NEEDING MORE HELP FROM BOOK 2 BY MID-DECEMBER FOR BOTH DAYS & NIGHT SHIFTS. WORKS LOOKS GOOD GOING INTO SPRING & LOTS OF WORK SCHEDULED GOING INTO THE NEW YEAR. CALL HALL FOR DETAILS.
LU-915 TAMPA, FL(10-18)
WORK IS GOOD IN THE AREA & CALLS ARE GOING INTO BOOK 2.HOSPITAL PROJECT HAS FINALLY BROKE & MILLER ELECTRIC HAS OPEN CALLS FOR THE FAWCETT MEMORIAL HOSPITAL IN PORT CHARLOTTE WORKING 7-12'S ALONG WITH OTHER HOSPITAL WORK IN THE JURISDICTION. THERE IS OTHER COMMERCIAL WORK IN THE TAMPA AREA AS WELL, WORKING OVERTIME AS IS THE SUNSEEKER RESORT IN PORT CHARLOTTE. POWERHOUSE WORK ALSO COMING & THAT IS EXPECTED TO BE WORKING OVERTIME AS WELL.CALL HALL FOR DETAILS.
LU-1426 GRAND FORKS, ND(11-22)
LOCAL IS STILL A WALKTHROUGH WITH CALLS IN THE GRAND FORKS, FARGO & FERGUS FALLS AREAS. MULTIPLE CALLS FOR A SOLAR PROJECT LASTING ONE YEAR (WORKING 4-10'S & AN 8) & A HOSPITAL LASTING 2 YEARS (WORKING 5-10'S W/POSSIBLE OVERTIME). MORE LARGE SCALE PROJECTS STARTING SOON. VISIT WEBSITE AT1426.orgFOR FULL LIST. ND OR MN STATE LICENSE REQUIRED, DEPENDING ON PROJECT.
LU-1516 JONESBORO, AR(11-30)
LOCAL IS BUSY WITH MAJOR $3 BILLION DOLLAR EXPANSION TO THE BIG RIVER STEEL PROJECT. CVE WORKING 5-10'S AS WELL AS PAYING $100/DAY INCENTIVE IF YOU LIVE 75 MILES FROM SITE OR PERDIEM IF YOU LIVE FARTHER. ORIENTATION OCT 21ST, SHUTDOWN START OCT 24TH-28TH. THERE IS ALSO A 7 DAY SHUTDOWN ONGOING AT NUCOR YAMATO THAT REQUIRES AR ELECTRICAL LICENSE, LONG SLEEVES, STEEL TOED BOOTS & PAYING $75/DAY PER DIEM .CACHE VALLEY ELECTRIC IS AT NUCOR YAMATO STEEL, NUCOR HICKMAN & BIG RIVER STEEL. OTHER LOCAL WORK AVAILABLE AS WELL. BOOKS MAY BE SIGNED IN PERSON OR FAX FROM HOME LOCAL. FAXSIGN IN REQUIRES CURRENT TRAVEL LETTER THAT MUST BE NOTARIZED WITH INITIATION DATE, CARD #, FULL SS #, STATE YOU HAVE 8000 HRS IN THE TRADE & DATE DUES ARE PAID THRU ALONG WITH A PAID UP DUES RECEIPT. THE LETTER WILL GET YOU YOUR TEMPORY JW LICENSE WITH A $25 CHECK OR MONEY ORDER IF YOU GET A CALL. LICENSE WILL BE GOOD FOR 6 MONTHS.CALL HALL FOR DETAILS.